Facebook Twitter YouTube Frictional Games | Forum | Privacy Policy | Dev Blog | Dev Wiki | Support | Gametee


Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
To all Frictional Games people. Just....thank you.
KieuPhong Offline
Junior Member

Posts: 1
Threads: 1
Joined: Aug 2019
Reputation: 0
#1
To all Frictional Games people. Just....thank you.

High-class double-layer anti-heat curtain, fabric curtain is composed of a light-blocking fabric curtain and a light-penetrating chiffon fabric inside to get gentle light from the outside while ensuring the shielding factor. Get visibility, privacy inside the room. https://thietkerem.vn/rem-vai/
- The outer layer of double-blind curtains is usually sewn in wavy style and opens on both sides, the fabric of the curtain can be selected in plain or patterned pattern, the inner layer of chiffon fabric is sewn in style. The glass is so easy to put in sheet simply because it is so fluffy and attractive for the curtain set.
https://www.minds.com/newsfeed/1000309795540586496
- White chiffon fabric is often selected to accompany sunscreen fabric, while patterned curtains, the manufacturer has also produced the same type of chiffon textures with layers of fabric to match each other.https://medium.com/@remvaibachduong/r%C3...ebd4c76afc
The chiffon layer has the same pattern as the sunscreen fabric
- Following are some pictures of high-class 2-layer fabric blinds that EveryHome Curtains have constructed for customers
What is the price of 2-layer fabric curtain?
- Conventional fabrics cost about 400,000 to 700,000 VND for 1 meter per layer, finishing construction period from 4-5 days
High quality sunscreen fabric insulated 100%, the price is from 1,300,000 to 1,800,000 VND for 1 meter per layer finishing a day, construction period from 4-5 days
Premium curtain imported from Korea, Belgium, Thailand is priced from 1,500,000 to 2,500,000 VND for 1 meter of finished goose depending on the color of iron and the material that you choose, the construction time is from 12-18 days, imports should be longer than the fabric is available.
(This post was last modified: 09-23-2019, 05:35 PM by KieuPhong.)
08-20-2019, 12:58 PM
Find
Kimaya5 Offline
Junior Member

Posts: 1
Threads: 0
Joined: Aug 2019
Reputation: 0
#2
RE: To all Frictional Games people. Just....thank you.

nice post...
08-22-2019, 07:18 AM
Find




Users browsing this thread: 2 Guest(s)